clear contracting construction prices -
template :19-23 Yuan / square meter (sticky gray surface) -
concrete :38-41 Yuan / cubic meters, -
reinforced :310-420 yuan / ton, or 10-13 yuan / m2-
masonry :55-70 Yuan / Li. -
plaster :7-15 yuan / square meter (not net of door and window openings, do not include ride demolition scaffolding) -
tile paste 18/m2.-
room floor tile (600 * 600) 15 yuan / square meter, -
baseboard: 3 yuan / m, -
room wall: 25 yuan / square meter (including the chamfered) -
stone staircase: 28 yuan / square meters, stepping board edging: 10 yuan / m. -
gypsum board ceiling: 20 yuan (flat roof) Lvkou Ban hanging items: 25 yuan / square meter, -
Taiwan cut off squatting :120-300 / rub bit. -
white latex paint: 6 yuan / square meter. -
outside the wall: 43 yuan / square meter, -
wall hanging mushroom: 50 yuan / square meters. -
roof battens: 13 yuan / square meter. -
Plumbing: 9 yuan / square meter (floor space) -
electrical lighting components: 6 yuan / square meter. -
woodworking :18-24 Yuan / square meter (sticky gray surface), carpentry 35-50 yuan / m2, -
Jia Zigong 5.5 yuan / m2, -
real estate construction costs (based on square meter operator) -
-1, foundations (if any): 70 ~ 100 yuan / square meter;
2, bar: 40 ~ 75KG / square meter (multi-layer content was lower, the higher level content), or 160 ~ 300 yuan / square meter; -
3, Concrete: 0.3 to 0.5 cubic meters / square meter (multi-layer content was lower, the higher level content), or 100 to 165 yuan / square meter; -
4, masonry works: 60 ~ 120 yuan / square meter (multi-layer high content, high content of low );-
5, plaster works: 25 to 40 yuan / square meter; -
6, exterior works (including insulation): 50 ~ 100 yuan / square meter (in general as the standard coating, such as stone or wall, it may be as high as 300 to 1000 yuan / square meter; -
7, the indoor installation of water (including fire): 60 ~ 120 yuan / square meter (at district level, multi-layer slightly lower );-
8, roof project: 15 ~ 30 Yuan / square meter (multi-layer high content, high content of low );-
9, doors and windows (excluding entry door): windows and doors per square meter of floor space area of about 0.25 to 0.5 square meters (with high-end design and are closely related to a larger proportion of high-grade), cost 90 ~ 300 yuan / square meter, generally 90 to 150 yuan / square meter, such as the use of high-grade aluminum windows and doors, you may reach 300 yuan / square meter; -
10, earth, entry door, flue and public parts of decoration: 30 to 150 yuan / square meter (high and low quality relationship with a great community, the higher the grade, the higher cost );-
11, basement (if any): increased cost of 40 ~ 100 yuan / square meter (multi-layer high content, high content of low );-
12, Elevator Engineering Company (if any): 40 ~ 200 yuan / square meter, and the grade of the elevator, the elevator and the floor to set the number of how many have great relations, general engineering is about 100 yuan / square meter; -
13, labor costs: 130 ~ 200 yuan / square meter; -
14, Outdoor matching projects: 30 ~ 300 yuan / square meter, generally about 70 to 100 yuan / square meter; -
15, templates, support, scaffold engineering (costs): 70 ~ 150 yuan / square meter; -
16, tower cranes, people and goods lifts, lifts and other various types of construction machinery, etc. (the total cost of about 5 to 8%: about 60 ~ 90 Yuan / square meter; -
17, the temporary facilities (living area, office area, warehouse, road, field other temporary facilities (water, electricity, sewage, images, and other production plant shelf space): 30 ~ 50 Yuan / square meter; - ;
18, testing, testing, procedures, transportation, communication and other expenses: 10 ~ 30 Yuan / square meter; -
19, contractor management fees, materials, labor, profits and other costs (about 10%): the sum of the above * 10% = 90 ~ 180 yuan / square meter; -
20, various taxes and fees paid to the state (the total cost of 3.3 ~ 3.5%): 33 ~ 70 Yuan / square meter, high-end may be as high as 100 yuan / square meter. -
not counted more than decoration, usually cost about 1000 ~ 2000 yuan / square meter, high-end residential up to 3,500 yuan. Above do not include some of the corruption caused by state-owned enterprises development costs. The decor is generally 500 to 1,500 yuan / square meter, depending on grade level, there are 300 yuan / square meter Jianzhuang Xiu, more 3,000 to 10,000 yuan / square meter ultra high-end renovation (bag check.) -
21, design fees (including fees during the initial design concept): 15 ~ 100 yuan / square meter; -
22, supervision fees: 3 to 30 yuan / square meter; -
23, advertising, planning, sales agents fees: generally 30 to 200 yuan / square meter, the higher up to 500 yuan / square meters; -
24, the land cost: general second-tier urban areas (the old rural areas) is 70 ~ 100 million / acre, floor area ratio is generally 1.0 to 2.0, so the conversion rate is: 525 ~ 1500 yuan / sq m, the urban center generally is 200 yuan / mu, conversion rates are: 1500 ~ 3000 yuan / sq m, the core region up to 300 yuan / mu, the land cost more unilateral; first-tier cities and even up to 20,000 yuan / square meter unilateral cost of the land above; third-tier cities, counties and other unilateral lower cost of land, usually 100 to 500 yuan / square meter, there are up to 2,000 yuan / square meters of the situation; -
25, land tax and pre-fee, generally about 15% of land costs, second-tier cities is generally 100 to 500 yuan / square meter, around the standard is different. -
Conclusion: The basic construction cost is fixed, even if we do not accept the relocation of the Housing section of land, construction of the national minimum standards, the cost is difficult to less than 1,000 yuan / square meter. In fact, the multi-ordinary housing, and Chien costs about 1,200 yuan / square meters, a small high-rise and high-level general commercial, and Chien cost about 1500 ~ 1800 yuan / square meters, the higher the grade, the higher the cost. Can be none other key is: the district level, the land to the government to pay part of the local government fees and taxes, advertising, sale of part of the cost of planning, renovation costs. In addition, the developer of the development of quality there is a certain relationship, If you always keep the prices down, quality is to be worse; private developers than the state / government developers indeed lower the cost, mainly two reasons, first, most of the private enterprises are mainly oriented to efficiency, cost control some better general, and second, the cost of private enterprise corruption is relatively lower. Whatever the reason, up and down with the quality of the district will not exceed the cost of 100 to 200 yuan / square meter. -
the basis of common sense
12 requires 64 square wall of a standard brick wall
18 a square requires 96 standard bricks
24 need 128 square wall of a standard brick wall of a square to be
37 to 192 standard bricks
49 wall must be a 256 a square brick
standard formula:
wall unit dosage of 240 cubic meters of 1 / (0.24 * 0.12 * 0.6 )
wall unit dosage of 370 cubic meters of 1 / (0.37 * 0.12 * 0.6)
hollow wall of a square requires 80 of 24 A multi-block standard brick
civil engineer should have the data (transfer)
an ordinary residential buildings of concrete and steel consumption volume:
; 1, multi-Masonry Residential:
reinforced concrete 0.3-0.33m3/m2 30KG/m2
2, multi-storey steel frame
38-42KG/m2
Concrete 0.33-0.35m3/m2
3, 11-12 layers of small high-rise steel 50-52KG/m2
Concrete 0.35m3/m2
4, 17-18 senior layer of steel 54
-60KG/m2
concrete 0.36m3/m2
5, 30-story high-level H = 94 米
; reinforced concrete 65-75KG/m2
0.42-0.47m3/m2
6, high-rise hotel 28-story apartment
H = 90 米 reinforced concrete 0.38-0.42m3/m2
65-70KG/m2
7, Villa amount of concrete and steel consumption is between 11-12 high-level multi-layer masonry between residential and more data are
7 degree earthquake zone rules design
Second, ordinary multi-storey residential building construction budget economic indicators
1, outside doors and windows (not including the cell door, security door) area total building area of 0.20-0.24
2, total construction area of the template area of about 2.2
3, the outdoor area of the floor area of plaster around 0.4
4, interior plaster will occupy an area of 3.8
three buildings, the construction efficiency
1, a plaster plaster work in the 35 square meters a day
2, a red brick brickwork 1000-1800 block puzzle day
3, a brick 800-1000 hollow brick work block puzzle day
4, tile 15 square meters
5, 300 square meters of first pass scraping white / day 180 m second time / day, the third time calendar of 90 square meters / day
four basic data
1, concrete weight 2500KG/m3
; 2, the weight of steel per meter 0.00617 * d * d
3, dry sand weight 1500KG/m3, wet sand weight 1700KG/m3
4, stone weight 2200KG/m3
5, about one cubic meter of red brick 525 (min thickness of the wall)
6, one cubic meter of hollow brick 175 or so
7, screening 1.3 one side clean sand to be a little different point of view of ordinary sand
:
1, the ordinary multi-storey residential masonry: steel 25-30KG/m2, including affordable housing for the 16--18KG/m2.
2, ordinary multi-storey masonry houses, plastering the outdoor area of the floor area of 0.5 - 0.7.
3, ordinary multi-storey masonry residential area of the building area template 1.3 - 2.2, according to the number of cast panels, a large column density.
4, a brick wall brickwork 1000-1800 240 puzzle pieces a day, 370 or 500 Wall 2000 - 3000 block.
5, reinforced concrete weight 2200KG/m3, plain concrete weight 2100KG/m3.
6, project stone weight 1800KG/m3. )
0.617 is the weight per meter of reinforced round of 10. Steel weight and diameter (radius) proportional to the square.
G = 0.617 * D * D/100
weight per meter (Kg) = bar diameter (mm) × diameter steel bars (mm) × 0.00617
in fact remember the weight of steel commonly used in construction projects is also very simple
φ6 = 0.222 Kg; φ6.5 = 0.26kg; φ8 = 0.395kg; φ10 = 0.617kg; φ12 = 0.888kg; Φ14 = 1.21kg; Φ16 = 1.58kg; Φ18 = 2.0kg ; Φ24 = 2.47kg; Φ22 = 2.98kg; Φ25 = 3.85kg; Φ28 = 4.837kg 12) below and Φ28 (including 28) of the steel generally take three digits after the decimal point, Φ14 Φ25 reinforced to take two digits after the decimal point generally
Φ6 = 0.222Kg
Φ8 = 0.395Kg
Φ10 = 0.617Kg
Φ12 = 0.888Kg
Φ14 = 1.21Kg
; Φ16 = 1.58Kg
Φ18 = 2Kg
Φ20 = 2.47Kg
; Φ22 = 3Kg
Φ25 = 3.86Kg
formula I have the experience, your own Calculation of a table on it. Forms can also go to buy a book with them is also very convenient.
theoretical weight of steel material name
simplified theoretical weight W (kg / m)
; flat steel, steel sheet, strip W = 0.00785 × width × thickness
square steel W = 0.00785 × side length 2
round bar, wire rod, steel wire W = 0.00617 × diameter 2
steel wall thickness W = 0.02466 × (OD - Wall Thickness)
; other side edge angle W = 0.00785 × thickness (2 edge width - edge thickness)
unequal angle W = 0.00785 × edge thickness (L short side edge width + width - edge thickness)
beam waist W = 0.00785 × thickness [high + f (leg width - waist thick)]
channel W = 0.00785 × waist thick [high + e (leg width - waist thick)]
Notes
1 , angle steel, channel steel I-beam and the exact formula is complex, and the table used to calculate the approximate simplified.
2, f values: general models and with a, 3.34, 2.65 with b, with c, was 2.26.
3, e values: general models and with a, 3.26, 2.44 with b, with c, 2.24.
4, the length of the units are in millimeters
First, the amount of ordinary residential buildings of concrete and steel capacity:
; 1, multi-Masonry Residential:
30KG/m2
reinforced concrete 0.3-0.33m3/m2
2, multi-storey concrete frame
reinforced 38-42KG/m2
0.33-0.35 m3/m2
3, 11-12 high-rise concrete layer
reinforced 50-52KG/m2
0.35m3/m2
4, 17-18 senior level
reinforced 54-60KG/m2
concrete 0.36m3/m2
5, 30-story high-level H = 94 米
65-75KG/m2
reinforced concrete 0.42-0.47m3/m2
6, 28-story high-rise apartments H = 90 米
65-70KG/m2
reinforced concrete 0.38-0.42m3/m2
7, villas, and the amount of concrete between steel consumption and high-level multi-storey residential masonry layer 11-12
7 degrees above the data zone rules by seismic design
Second, ordinary multi-storey residential building construction budget economic indicators
1, outside doors and windows (not including cell door, security door) area of the floor area of 0.20-0.24
2, total construction area of 2.2 template area around
3, the outdoor area of the floor area of plaster about 0.4
4, interior plaster total construction area of 3.8
area of the three, the construction efficiency
1 , a plaster plaster work day in the 35 square meters
2, a red brick brickwork 1000-1800 day puzzle pieces
3, a hollow brick brickwork 800-1000 day puzzle pieces
4, 15 square meters of ceramic tile
5, 300 square meters of first pass scraping white / day, and the second over 180 square meters / day, the third time calendar of 90 square meters / day
four basic data
1, concrete weight 2500KG/m3
2, the weight of steel per meter 0.00617 * d * d
3, dry sand weight 1500KG/m3, wet sand weight 1700KG/m3
4, stone weight 2200KG/m3
5, one cubic meter of red about 525 bricks (sub thickness of the wall)
6, one cubic meter of about 175 hollow brick
7, screen clean sand to be 1.3 square one ordinary sand