Wednesday, April 27, 2011

Tuesday, April 26, 2011

Sunday, April 24, 2011

Tripe sac removed

These small movements , as long as ten minutes a day to pick one to do will bear fruit within two weeks . These are slow to do aerobic exercise to the do not Pinliaolaoming , each action is appropriate to maintain 3 to 5 seconds . If this is the first time for the next twenty people recommend a look at the daily increase in
personal situation but we must not Taimian Jiang persevere on it! ! ! 1. beautifying the waist, the elimination of fat 2. strengthen the abdominal muscles and back of the tendon 3. the right and left stretch 4. beautifying the back line , to prevent cervical disease 5. hands and feet to balance the body about 6. while increasing the flexibility of hand Degree 7. tighten the abdominal muscles 8. minus the small pot 9. increase the flexibility of strong arm of 10 feet . Tunbuxiachui eliminate the fat and tight leg muscles 11. Tunbuxiachui eliminate the fat and tight leg muscles 2 At a friend's room to see this article, I feel useful to do some exercise it with everyone , except little stomach , cervical pain is very bad drop ~ ~ ~

Clearing price of construction contracting

clear contracting construction prices -

template :19-23 Yuan / square meter (sticky gray surface) -
concrete :38-41 Yuan / cubic meters, -
reinforced :310-420 yuan / ton, or 10-13 yuan / m2-
masonry :55-70 Yuan / Li. -
plaster :7-15 yuan / square meter (not net of door and window openings, do not include ride demolition scaffolding) -
tile paste 18/m2.-
room floor tile (600 * 600) 15 yuan / square meter, -
baseboard: 3 yuan / m, -
room wall: 25 yuan / square meter (including the chamfered) -
stone staircase: 28 yuan / square meters, stepping board edging: 10 yuan / m. -
gypsum board ceiling: 20 yuan (flat roof) Lvkou Ban hanging items: 25 yuan / square meter, -
Taiwan cut off squatting :120-300 / rub bit. -
white latex paint: 6 yuan / square meter. -
outside the wall: 43 yuan / square meter, -
wall hanging mushroom: 50 yuan / square meters. -
roof battens: 13 yuan / square meter. -
Plumbing: 9 yuan / square meter (floor space) -
electrical lighting components: 6 yuan / square meter. -
woodworking :18-24 Yuan / square meter (sticky gray surface), carpentry 35-50 yuan / m2, -
Jia Zigong 5.5 yuan / m2, -

real estate construction costs (based on square meter operator) -
-1, foundations (if any): 70 ~ 100 yuan / square meter;
2, bar: 40 ~ 75KG / square meter (multi-layer content was lower, the higher level content), or 160 ~ 300 yuan / square meter; -
3, Concrete: 0.3 to 0.5 cubic meters / square meter (multi-layer content was lower, the higher level content), or 100 to 165 yuan / square meter; -
4, masonry works: 60 ~ 120 yuan / square meter (multi-layer high content, high content of low );-
5, plaster works: 25 to 40 yuan / square meter; -
6, exterior works (including insulation): 50 ~ 100 yuan / square meter (in general as the standard coating, such as stone or wall, it may be as high as 300 to 1000 yuan / square meter; -
7, the indoor installation of water (including fire): 60 ~ 120 yuan / square meter (at district level, multi-layer slightly lower );-
8, roof project: 15 ~ 30 Yuan / square meter (multi-layer high content, high content of low );-
9, doors and windows (excluding entry door): windows and doors per square meter of floor space area of ​​about 0.25 to 0.5 square meters (with high-end design and are closely related to a larger proportion of high-grade), cost 90 ~ 300 yuan / square meter, generally 90 to 150 yuan / square meter, such as the use of high-grade aluminum windows and doors, you may reach 300 yuan / square meter; -
10, earth, entry door, flue and public parts of decoration: 30 to 150 yuan / square meter (high and low quality relationship with a great community, the higher the grade, the higher cost );-
11, basement (if any): increased cost of 40 ~ 100 yuan / square meter (multi-layer high content, high content of low );-
12, Elevator Engineering Company (if any): 40 ~ 200 yuan / square meter, and the grade of the elevator, the elevator and the floor to set the number of how many have great relations, general engineering is about 100 yuan / square meter; -
13, labor costs: 130 ~ 200 yuan / square meter; -
14, Outdoor matching projects: 30 ~ 300 yuan / square meter, generally about 70 to 100 yuan / square meter; -
15, templates, support, scaffold engineering (costs): 70 ~ 150 yuan / square meter; -
16, tower cranes, people and goods lifts, lifts and other various types of construction machinery, etc. (the total cost of about 5 to 8%: about 60 ~ 90 Yuan / square meter; -
17, the temporary facilities (living area, office area, warehouse, road, field other temporary facilities (water, electricity, sewage, images, and other production plant shelf space): 30 ~ 50 Yuan / square meter; - ;
18, testing, testing, procedures, transportation, communication and other expenses: 10 ~ 30 Yuan / square meter; -
19, contractor management fees, materials, labor, profits and other costs (about 10%): the sum of the above * 10% = 90 ~ 180 yuan / square meter; -
20, various taxes and fees paid to the state (the total cost of 3.3 ~ 3.5%): 33 ~ 70 Yuan / square meter, high-end may be as high as 100 yuan / square meter. -
not counted more than decoration, usually cost about 1000 ~ 2000 yuan / square meter, high-end residential up to 3,500 yuan. Above do not include some of the corruption caused by state-owned enterprises development costs. The decor is generally 500 to 1,500 yuan / square meter, depending on grade level, there are 300 yuan / square meter Jianzhuang Xiu, more 3,000 to 10,000 yuan / square meter ultra high-end renovation (bag check.) -
21, design fees (including fees during the initial design concept): 15 ~ 100 yuan / square meter; -
22, supervision fees: 3 to 30 yuan / square meter; -
23, advertising, planning, sales agents fees: generally 30 to 200 yuan / square meter, the higher up to 500 yuan / square meters; -
24, the land cost: general second-tier urban areas (the old rural areas) is 70 ~ 100 million / acre, floor area ratio is generally 1.0 to 2.0, so the conversion rate is: 525 ~ 1500 yuan / sq m, the urban center generally is 200 yuan / mu, conversion rates are: 1500 ~ 3000 yuan / sq m, the core region up to 300 yuan / mu, the land cost more unilateral; first-tier cities and even up to 20,000 yuan / square meter unilateral cost of the land above; third-tier cities, counties and other unilateral lower cost of land, usually 100 to 500 yuan / square meter, there are up to 2,000 yuan / square meters of the situation; -
25, land tax and pre-fee, generally about 15% of land costs, second-tier cities is generally 100 to 500 yuan / square meter, around the standard is different. -

Conclusion: The basic construction cost is fixed, even if we do not accept the relocation of the Housing section of land, construction of the national minimum standards, the cost is difficult to less than 1,000 yuan / square meter. In fact, the multi-ordinary housing, and Chien costs about 1,200 yuan / square meters, a small high-rise and high-level general commercial, and Chien cost about 1500 ~ 1800 yuan / square meters, the higher the grade, the higher the cost. Can be none other key is: the district level, the land to the government to pay part of the local government fees and taxes, advertising, sale of part of the cost of planning, renovation costs. In addition, the developer of the development of quality there is a certain relationship, If you always keep the prices down, quality is to be worse; private developers than the state / government developers indeed lower the cost, mainly two reasons, first, most of the private enterprises are mainly oriented to efficiency, cost control some better general, and second, the cost of private enterprise corruption is relatively lower. Whatever the reason, up and down with the quality of the district will not exceed the cost of 100 to 200 yuan / square meter. -

the basis of common sense
12 requires 64 square wall of a standard brick wall
18 a square requires 96 standard bricks
24 need 128 square wall of a standard brick wall of a square to be
37 to 192 standard bricks
49 wall must be a 256 a square brick
standard formula:
wall unit dosage of 240 cubic meters of 1 / (0.24 * 0.12 * 0.6 )
wall unit dosage of 370 cubic meters of 1 / (0.37 * 0.12 * 0.6)
hollow wall of a square requires 80 of 24 A multi-block standard brick
civil engineer should have the data (transfer)
an ordinary residential buildings of concrete and steel consumption volume:
; 1, multi-Masonry Residential:
reinforced concrete 0.3-0.33m3/m2 30KG/m2

2, multi-storey steel frame
38-42KG/m2
Concrete 0.33-0.35m3/m2
3, 11-12 layers of small high-rise steel 50-52KG/m2

Concrete 0.35m3/m2
4, 17-18 senior layer of steel 54
-60KG/m2
concrete 0.36m3/m2
5, 30-story high-level H = 94 米
; reinforced concrete 65-75KG/m2
0.42-0.47m3/m2
6, high-rise hotel 28-story apartment
H = 90 米 reinforced concrete 0.38-0.42m3/m2
65-70KG/m2
7, Villa amount of concrete and steel consumption is between 11-12 high-level multi-layer masonry between residential and more data are
7 degree earthquake zone rules design
Second, ordinary multi-storey residential building construction budget economic indicators
1, outside doors and windows (not including the cell door, security door) area total building area of ​​0.20-0.24
2, total construction area of ​​the template area of ​​about 2.2
3, the outdoor area of ​​the floor area of ​​plaster around 0.4
4, interior plaster will occupy an area of ​​3.8
three buildings, the construction efficiency
1, a plaster plaster work in the 35 square meters a day
2, a red brick brickwork 1000-1800 block puzzle day
3, a brick 800-1000 hollow brick work block puzzle day
4, tile 15 square meters
5, 300 square meters of first pass scraping white / day 180 m second time / day, the third time calendar of 90 square meters / day
four basic data
1, concrete weight 2500KG/m3
; 2, the weight of steel per meter 0.00617 * d * d
3, dry sand weight 1500KG/m3, wet sand weight 1700KG/m3
4, stone weight 2200KG/m3
5, about one cubic meter of red brick 525 (min thickness of the wall)
6, one cubic meter of hollow brick 175 or so
7, screening 1.3 one side clean sand to be a little different point of view of ordinary sand
:
1, the ordinary multi-storey residential masonry: steel 25-30KG/m2, including affordable housing for the 16--18KG/m2.
2, ordinary multi-storey masonry houses, plastering the outdoor area of ​​the floor area of ​​0.5 - 0.7.
3, ordinary multi-storey masonry residential area of ​​the building area template 1.3 - 2.2, according to the number of cast panels, a large column density.
4, a brick wall brickwork 1000-1800 240 puzzle pieces a day, 370 or 500 Wall 2000 - 3000 block.
5, reinforced concrete weight 2200KG/m3, plain concrete weight 2100KG/m3.
6, project stone weight 1800KG/m3. )
0.617 is the weight per meter of reinforced round of 10. Steel weight and diameter (radius) proportional to the square.
G = 0.617 * D * D/100
weight per meter (Kg) = bar diameter (mm) × diameter steel bars (mm) × 0.00617
in fact remember the weight of steel commonly used in construction projects is also very simple
φ6 = 0.222 Kg; φ6.5 = 0.26kg; φ8 = 0.395kg; φ10 = 0.617kg; φ12 = 0.888kg; Φ14 = 1.21kg; Φ16 = 1.58kg; Φ18 = 2.0kg ; Φ24 = 2.47kg; Φ22 = 2.98kg; Φ25 = 3.85kg; Φ28 = 4.837kg 12) below and Φ28 (including 28) of the steel generally take three digits after the decimal point, Φ14 Φ25 reinforced to take two digits after the decimal point generally
Φ6 = 0.222Kg
Φ8 = 0.395Kg
Φ10 = 0.617Kg
Φ12 = 0.888Kg
Φ14 = 1.21Kg
; Φ16 = 1.58Kg
Φ18 = 2Kg
Φ20 = 2.47Kg
; Φ22 = 3Kg
Φ25 = 3.86Kg
formula I have the experience, your own Calculation of a table on it. Forms can also go to buy a book with them is also very convenient.
theoretical weight of steel material name
simplified theoretical weight W (kg / m)
; flat steel, steel sheet, strip W = 0.00785 × width × thickness
square steel W = 0.00785 × side length 2
round bar, wire rod, steel wire W = 0.00617 × diameter 2
steel wall thickness W = 0.02466 × (OD - Wall Thickness)
; other side edge angle W = 0.00785 × thickness (2 edge width - edge thickness)
unequal angle W = 0.00785 × edge thickness (L short side edge width + width - edge thickness)
beam waist W = 0.00785 × thickness [high + f (leg width - waist thick)]
channel W = 0.00785 × waist thick [high + e (leg width - waist thick)]
Notes
1 , angle steel, channel steel I-beam and the exact formula is complex, and the table used to calculate the approximate simplified.
2, f values: general models and with a, 3.34, 2.65 with b, with c, was 2.26.
3, e values: general models and with a, 3.26, 2.44 with b, with c, 2.24.
4, the length of the units are in millimeters
First, the amount of ordinary residential buildings of concrete and steel capacity:
; 1, multi-Masonry Residential:
30KG/m2
reinforced concrete 0.3-0.33m3/m2
2, multi-storey concrete frame
reinforced 38-42KG/m2
0.33-0.35 m3/m2
3, 11-12 high-rise concrete layer
reinforced 50-52KG/m2
0.35m3/m2
4, 17-18 senior level
reinforced 54-60KG/m2
concrete 0.36m3/m2
5, 30-story high-level H = 94 米
65-75KG/m2
reinforced concrete 0.42-0.47m3/m2
6, 28-story high-rise apartments H = 90 米
65-70KG/m2
reinforced concrete 0.38-0.42m3/m2
7, villas, and the amount of concrete between steel consumption and high-level multi-storey residential masonry layer 11-12
7 degrees above the data zone rules by seismic design
Second, ordinary multi-storey residential building construction budget economic indicators
1, outside doors and windows (not including cell door, security door) area of ​​the floor area of ​​0.20-0.24
2, total construction area of ​​2.2 template area around
3, the outdoor area of ​​the floor area of ​​plaster about 0.4
4, interior plaster total construction area of ​​3.8
area of ​​the three, the construction efficiency
1 , a plaster plaster work day in the 35 square meters
2, a red brick brickwork 1000-1800 day puzzle pieces
3, a hollow brick brickwork 800-1000 day puzzle pieces
4, 15 square meters of ceramic tile
5, 300 square meters of first pass scraping white / day, and the second over 180 square meters / day, the third time calendar of 90 square meters / day
four basic data
1, concrete weight 2500KG/m3
2, the weight of steel per meter 0.00617 * d * d
3, dry sand weight 1500KG/m3, wet sand weight 1700KG/m3
4, stone weight 2200KG/m3
5, one cubic meter of red about 525 bricks (sub thickness of the wall)
6, one cubic meter of about 175 hollow brick
7, screen clean sand to be 1.3 square one ordinary sand

Wednesday, April 13, 2011

The difference between the list and fixed

 First, inventory and fixed flat ground
different parts of different list to the bottom of the construction area. Fixed to the bottom floor area of ​​foreign expansion 2M.
excavation different: the list to cushion the bottom area by digging deep, fixed to add face, allowing the case promised to put slope.
Interior height difference: to the board the top of the list operators, fixed base operator to the board.
Awning different: the list to the volume, fixed in space.
balcony different: the list to the volume, fixed in space.
Second, the list of debris and fixed the same part of the
Sinotrans: excavation volume - based masonry backfill volume = volume = outdoor + cushion floor elevation of the following foundation laid by the volume - Indoor Floor backfill above the backfill volume
site: area × average thickness Backfill Backfill = S
indoor net * (indoor and outdoor height - floor thick)
foundation backfill: the volume of cut - outdoor floor elevation planted the following the basis of volume (wall base, column base, tube base, cushion)
foundation compaction: design based on the icon size m2
cushion: design icon size m3
floor cushion: V = S Net h,
S net = S at the end - (L within the T + L t), net of protruding surface structures, equipment foundations, indoor pipes, the volume occupied by the trench; without deduction column, stack, wall partitions, with a wall of the chimney pore size ≤ 0.3 m2 and the volume occupied by
other cushion: design icon size m3
brick base: V = LA-ground (circles) beams, structural columns the size of a-Σ> 0.3 m2 holes base area × thickness of the wall (b); H: the depth of foundation design; h big place off the foot plus height
L: wall centerline, interior basis of net long-term
A = area + wall area of ​​a large release pin = b (H + h)
Note: Heating groove overhangs the wall does not increase, with a prominent part of the basis of the volume into Qiangduo based brick base and brick wall boundaries
: design interior to Ping Shek base, Le, brick wall: outdoor floor
Schleswig wall: stone wall indoor floor
: not the same inside and outside the floor elevation of the lower of; elevation between the inside and outside the retaining wall, retaining wall above the floor in the room ± 300 or less, to the boundary of different materials; more than ± 300, the interior brick floor for the sector
: (L × wall wall high-Σ> 0.3 m2 pore size) × thickness of the wall-Σ component volume (embedded)
long wall: wall centerline, the net long-term
interior wall height: wall: ① inclined roof eaves ceiling were not counted until the end of ② inclined roof with roof roof and ceiling are both indoor and outdoor, operator bottom chord to the underside of roof inclined roof +200 mm
③ who have no ceiling to the roof truss bottom chord count underside +300 mm
④ the canopy width> 600mm, height
⑤ in real puzzle to the flat roof of reinforced concrete board operator
Interior: ① in the roof the last Quarter, calculated to the roof without roof by the end of
② counted until the end of +100 mm
③ ceiling with reinforced concrete floor compartment are considered to board a framework for the end of
④ beam to beam end when the operator
parapet: roof parapet on the surface pressure calculated from the lower surface of
inside and outside the gable roof: average height
net: door and window openings, extraordinary holes, empty circle, into a wall of reinforced concrete columns, beams, beam, cantilever beam, brick flat to Gateway, brick lintels and recessed wall niches, ducts, heating pipes, fire box, a top interior wall panels without increasing the size of a
: wall protruding waistline, cornice, top, window sill line, tiger tiles, doors and windows set into the volume
: bulging brick wall brick chimney stack
, brick towers: the centerline of the cylinder wall weekly average length × thickness × height; deducting various holes in reinforced concrete beam, lintel and other volume. To expand the part of the top brick is bounded
chimney Road: icon size, actual size
block walls: design icon size m3 net> 0.3 m2 void volume
stone base: with the brick base < br> brick bulk water: design icons m2
situ concrete foundation: design icon size m3, without deduction within the steel components, embedded mixed cast iron soil column volume
: design size m3, not withhold components in steel, embedded iron
column height:
have slab column: column base (or floor) on the surface of first layer of flat-slab floor on the surface
column: File-based (or floor) on the surface to the column under the cap surface
Columns: column base structure on the surface to the top of the column
column: Overall height (with the brick wall into the inserting part of the volume) V = (B + b) AH + K
dependent column on the bracket, into the column body product, such as rectangular columns, special columns, structural columns and other
place concrete beams
beam and column connections, beam length operator
primary and secondary beam to column connection side, secondary beam to main beam length operator
stretching the walls of the beam side head into the
beam pad situ concrete wall volume: V = Lht-Σ0.3m2 void area above the doors and windows × t
L: outside the center line, the net long-term; a column to the column side were counted; h: Based on the surface to the top of the wall there
situ concrete slab board
: beams, plates and the volume of flat-slab
: volume of plates and column caps and wall board
stretching into the boards head size
situ concrete stairs: s = LA-CX, horizontal projection area of ​​not less C <500 in the stairwell, stretching precast concrete wall panels without adding some other elements (terrazzo, precast reinforced concrete tank small tank, top, handrails, block board, pad, insulation panels, lattice)
design icon size is not deducted members covered m3 steel, iron less than 300 × 300
holes the size of a concrete structure:
design icon size is not deducted m3 steel components embedded within the iron ≤ 0.3 m2 holes the size of a (sub-components are presented items) < br> steel works (post-tensioned):
reserved channel length L
⒈ low-alloy steel
① Screw Anchors: L-0.35m, the other operator
② Screw Heading inserted film + screw anchor, L Screw Heading the other operator
③ Insert + help article anchorage, L +0.15 m
④ help section anchor L +0.3 m
⑤ from post-tensioned concrete Anchor L +0.35 m
⑥ JM, XM, QM
L +1 m (L ≤ 20m) L +1.8 m (L> 20m)
⒉ strand: Carbon steel wire with ⑹
⒊ ⑴ conical anchor: Upsetting the same ⑹ ⑵ head: L +0.35 m
wooden staircase: Picture shows the external dimensions, the horizontal projection area m2
primary wood roofing: design icons size, slope area m2
tile, roof profiles
design icon size, slope area of ​​not less
: Room on the chimney, hood base, air duct, stingy windows, oblique groove
not increase: the window of the canopy roof stingy part < br>
⒈ roofing membrane, coating: Design Icon Size m2
⑴ sloping roofs (flat roof dismay to find slope): ramp area
⑵ flat roof: the level of projected area
not Less: Ibid
into: roof parapets, expansion joints, and bent parts of skylights and other roof

⒉ rigid waterproof design icon size m2 not withhold the room on the chimney, hood base, duct, etc.
drainage design icon size
not dimensioned length m to the eaves to the design of the ground outside the vertical distance
roof gutter design icon size m2; iron sheet and coil gutter wall by expansion area
, the ground water
⒈ membrane, film, rigid: Design Icon Size m2
⑴ ground: the net area between the main wall of the ground
less protruding structures, equipment foundations
without deduction: column , stack, wall partitions, chimneys, ≤ 0.3 m2 holes
⑵ base of the wall: wall centerline; interior design of the net long-term
⒉ icon size m
deformation joint anti-corrosion surface layer
design display size m2; less protruding above ground structures, equipment foundations; preservation of the brick facade and other prominent part of the stack into the developed area of ​​the wall by the amount of corrosion engineering and corrosion barrier
asphalt coating: ibid
compartment wall insulation Heat: Ibid. Refrigerator door openings and pipe net wall insulation hole the size of a column
: design icon size m3, started the center line of the insulation layer length × height × thickness (not including the adhesive layer thickness)
whole surface layer: Design Icon Size m2
net: protruding above ground structures, equipment foundations, trench
not withhold: column, stack, wall partitions, with a wall of the chimney does not increase ≤ 0.3 m2
: openings, empty circle, Heating Package trough the opening on the staircase, decorative

design icon size, level of projected area, including: still, resting platform, 500mm
within the stairwell handrails, bar bar, tailgate decoration design icon
center armrest Line m not withhold the elbow
design stage decoration
icon size, level of projected area
General Plastering
wall design icon size, vertical projection area
wall: plaster surface the vertical projection area
Interior: Interior floor (or dado top)
to the underside of the ceiling
net: door and window openings> 0.3m2
not withhold: baseboard, hanging mirror line, ≤ 0.3 m2 wall junction
not increase with the components: door and window openings into the cavity of the wall area: Qiang Zhu side with decorative plaster wall plaster
, brace gray, gray hair above
wall of rejection pointing vertical projection surface area m2
deductions: wall panels and wall plaster area
not withhold: door and window openings, door and window sets, waist and other areas scattered
without plastering: a report of Qiang Zhu, and door and window openings pointing
side note: the baseboard and the wall of the same material, or baseboard has been included in the walls, dado within the project, and is no longer listed separately
cylinder plaster (including pointing) : Design Icon Size m2
design decorative plate wall
icons, wall less net long × net height
door and window openings,> 0.3 m2
decorative plate column (beam) surface
Design icon size of the outer ring facing × height
incorporate: column caps, dolphins quantities
partition: the design icon, the external frame size
net:> 0.3 m2 holes; into: bathroom partition doors the same material, their size
door curtain: the design icon, the external wall area
ribbed full glass curtain wall: Expand Size m2

plaster ceiling design icon size m2 ( net area between the main wall)
not deduct: septal wall, stack column, with a wall of the chimney, check the mouth, into the pipeline
: with beam ceiling, plaster on both sides of an area of ​​
plate girder bottom of the stairs: oblique area of ​​the underside of the stairs serrated
: Expand Area.

Sunday, April 10, 2011

Three people in life

 Life three
day when we travel, imagine 3 people off.

1, the first man crying from morning to let you go, have been holding your hand and said, will always think of you, an appointment contact several times a day, you get to the door, and then back into the house to see his TV idol concert.

2, the second person to help you pack, make breakfast for you, drive you to the airport, said: take care! Then back to work.

3, the third man sat in silence far away from you looking at you, nothing to do nothing, you can almost feel his presence. But he miss you, always worried about you every day early in the evening three times to his peace of God, pray you, and be quiet in prayer.

When we come back, we:

1, to the first person to buy a lot of lovely gifts, take him to dinner, go to the playground, we are very happy to see him, I feel clear security, and even the color of the sky becomes transparent.

2, a second person a hug and help him take out the garbage, as he can take a lot of money this month, but happy to have his company and lucky.

3, to a third person a polite smile and said: Hey! Then do not know how to express.

the time when we lose them:

1, lost the first one, we lose life, colors, dark for some time, suddenly encountered a new color in the corner, start a new journey.

2, lost the second person, we have lost arms, unable to lift the burden of the future, eat a lot of supplements, finally restitution.

3, lost a third person, is beginning to feel, and finally found one day loss since the day from his soul is taken away, find out the invisible fortress, never filled.

first lover's feelings, children, friends, young.
feelings
second husband, wife, friends, middle-aged.

third feelings parents, lover, confidant, and forever.

first is paid by the language.

The second is the time to pay.

third is paid by the life.

Wednesday, April 6, 2011

Basic etiquette, benefit for life

 Go to another home, people do not sit on the bed

2. in the clink wine on the table with others, their own glass must be lower than the other, especially the elders or the other party is leading

3. sunny umbrella, full with dry food --- rainy day is always good.

4. If you ask people if people do not answer you, do not die with the nerve to keep asking.

5. eat, try not to sound

6. time to pick something to wear shoes or squatted, do not bend you gotta

7. others to criticize your time, even if he is wrong, do not split first identified, so we all calm down and explain

8. to do things to stop, whether it is binge eating favorite food or losing his temper

9. to a friend's house after dinner, take the initiative to help clean up the table ----- wash owner has been very hard to cook, can not also allow the owner to clean up afterwards

10. life will meet all kinds of kind of person, you can not in tune with each person, but one thing is universally applicable: How do you treat others, how others will treat you

11. hospitality have large, housekeeping had Small

12. his fist back to strike back to a more powerful

13. who live in the world, we must first learn a Do not time for anyone to tell each other your secrets

15. save money does not depend on, and will spend will earn

16. life-long learning, not just learn the book knowledge, but To learn how to dealing with people, society more complex than you think

17. Do not talk with my colleagues in the non-supervisors or other colleagues, your mood is likely to be someone else's words against your evidence
< br> 18. to do things, do a good job is your part, is that you do not negligent

19. only the wrong buy, nothing wrong with selling. Do not just a petty advantages.

20. Sometimes the loneliness is normal, do not be afraid, it has to swap

21. a true friend, but I wonder if you have good fortune encountered. With or without experience, do not deny it. Do not calculated to others, especially not calculating your favorite people. Of your favorite people, do not use means to get

22. The most courageous thing is to recognize the truth of life after the still love life. Do not be afraid to deceive, but to know the existence of the world deceived

23. To borrow money when the heart must be a bottom, is to think of the money from him. So take forever to get the money he can afford to lose range. Less than the number of affordable, even if not come back, but also as early as prepared mind. They can not afford to lose the number, not by

24. The best friends, unless he could eat poor food, and it would be best not to have economic relations. Many valuable friendships are ruined on the money.

25. gentleman can be meaning in things, but not pay attention to things

26. away from home you may be able to tolerate, take a step backward

27.'s time to wipe the table direction to wipe their

28. call the phone the first thing it must be fed, Hello; hang when waiting for someone else to hang

29. a hundred times not to be unfaithful < br>
30. do not spit throwing things, and if there is no trash to carry home to throw trash

31. more books to our mind, you will see a broader World

32. but for you to adapt to society, not society to adapt to your

33. Do not let others know their true thoughts, to laugh in front of people laugh, cry tears of a man hiding

34. Do not walk hand in his pockets

35. to do simple things complicated and complicated things simple and do

36. opportunity to leave only the prepared mind the sky will not fall out

37. No matter under what conditions, carefully brush your teeth, especially at night

38. morning must eat breakfast, no breakfast, a cup of water is also necessary to < br>
39. the less people right and wrong, his own management firm

40. You're invaluable

41. girls, and boys go out to their own pay

42 . To be responsible for their actions, not blaming Heaven by the people, think before doing should not be out of trouble to learn to solve their own

43. in order to dignitaries in front of people, we must first people to suffer after the.